![]() |
Corporate practice bd |
Measurement Criteria:-
1 Decimal = 435.6 square feet.(Approx).
33 Decimal = 1 Biga
3 Biga = 1 akor.
1 akor = 100 Decimal
10 Decimal = 6 kata.
1 Biga = 20 kata
5 decimal = 3 kata
1 kata = 1.65 Decimal
60.5kata = 1 akor
2.47 akor = 1haqtor
1 hand = 1.50 feet
1000 square link=1Decimal
1 Akor = 10000 (Ujo tangsho)
100 (Ujo tangsho) =1 Decimal
20 Katha = 1 Bigha
3 Bighas = 1 Acre approx. (1600 square yards)
4 Kora = 1 Gonda
20 Gonda = 1 Kani
80 Kora = 1 Kani
120 Decimal = 1 Kani
There are most important land surveys in Bangladesh are
01. CS (Survey):- (1889-1940)(start from coxes bazar in ramo & end of Dinuspur) (DS/40 Khatiun)
02. SA (Survey):- (1956 to 1963/1965 ) (MRR/MR/PS/62/record of right (ROR)(49/50/51/52 section include)
03. R S /BS/BRS (Survey):-(1932 to 1946)
04. CITY (Survey):-(2000) (Last &Modern Survey in Bangladesh)(only for Dhaka)
05. Mutation/numjari /numpotton/Khariz(Sec-IXI/901/1718
A.In the comment section must reference in the previous khatiun kess number.
B.AC land cill include.
06.DP/Khasda/Khartiun
A. There exist nine column
B. Exist DP number.
07. Mut padsa khatuin
A. Hand writing name of the owner
The short description of the land survey are as follows.
01. CS (Survey):- Section 105,105/ Kha,106,108,109,115 Kha
01. It is the first survey which is operating range from(1889 to 1940).
02. Also published Plot number, Khatiun number & naksha of the owner of the land for the whole country of bangladesh.
03. It also exist two pages
04. It is must be Legal size
05. Name of the jomider top of the left side simultaneously have details of the proja down left side of the khatuin.
06.There is no Map involving in
02. SA (Survey):-
SA survey which is operating range from(1956 after dissolution of the jomideri protha.
01. It must be 01 pages
02 . It is must be ADA -ADI size.
03. must have shabek khatiun er CS & Hal number exist in the top of left side.
4.There is no Map involving in SA khatiun
03. R S /BS/BRS (Survey):-(1932 to 1946)
Being mistake in the SA khatiun govt take necessary action by applying RS Survey in Bangladesh.
01. Its may be one or two pages.
02. it is must be legal size
03. It must be include Resurvey number top of the right side of RS khatiun.
04. Its divided tow parts name Krisi U krisi.
05. Jel number exist.
04. CITY (Survey):-(2000) (Last &Modern Survey in Bangladesh)
01. IT must be computer printed
02.Thre are nine column in the City Jorip in dhaka only
03. Cill indicating Dhaka City Jorip each pages
04. Nature of land include.